1. Task 1 is to design a masterplan, as in the project handout, showing buildings in the Ithuba masterplan pdf. Off-hand, recall
- administration / entrance with approx 2 offices for site management, 1 for primary, 1 for high school, 1 for skills training & 1 for housing.
primary, 4 classrooms approx 45-60msq ea. with childrens ergonomics, & a shared toilet, (to be developed for TASK 2)
upper school 4 " " .
hall as per pdf
skills centre as per pdf
housing for teachers, staff, approx 50msq ea in a linear arrangement of 2 wings on the South boundary, (to be developed by LK & AjvR).
housing for students to be used as bed & breakfast skills training along the East (sports field) edge as per pdf
Illustrate with site plan showing fall of 2m accross the site to North, with site models, scale 1:500.
2. Task 2 is to develop the design for the primary classrooms with plans & sections & sketch model at 1:100 or 1:50.
3. Task 3 is to divide into task groups for the construction of the model housing unit for Mr Muushe, to be built in June on site
Fundraising literature (including a CD?)
Fundraising PR to approach companies
Materials measuring with Wits Quantity Survey dept
Materials order and coordination to consult with Michele Riedmatten for Construction
Site management for materials & setting out, storage tools etc.
Site foreman (one of our own!)
Site construction team
Materials and parts backup for site
Website
Surveying
Task 3 will be assessed as part of the project mark. You need to be in a group and working on it by the end of today, 18 Feb.
Wednesday, February 20, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment